Frontier compute, dedicated by design — whole Vera Rubin pods, bare metal, run like infrastructure.
The cloud
Every campus is built for one platform: NVIDIA Vera Rubin, the current frontier. No legacy tiers, no mixed stack — rack-scale compute, operated for tenants who need whole pods, not GPU-hours.
72 GPUs in a single NVLink domain per rack at 200 kW, liquid-cooled — the most productive inference silicon in the market, deployed as whole racks, never as slices.
Rack-scale NVLink domains scaled out on the NVIDIA reference fabric, delivered bare-metal — no virtualization tax between the tenant and the silicon.
Capacity is sold in dedicated 5 MW blocks under long-term terms — single-tenant, isolated environments with managed Kubernetes and Slurm, run by an experienced cloud operator from the first rack.
Workload telemetry, 24/7 operations and a SOC 2 program — with power, cooling and the cloud layer under one roof and one accountable team.

Cooling
Modern AI racks reject most of their heat into liquid. Campus One is built on the NVIDIA DSX POD reference design: the racks, coolant distribution units, plumbing and cabling of each pod are integrated and validated in the factory, then the pod rolls into the hall and connects to a sealed warm-water loop and dry coolers — radiators and fans, no evaporation, no compressors on the compute path. The building's own air system rides on new sealed trim chillers, with the existing central plant valved in behind it as emergency backup.
Each DSX POD unit arrives with its internal loop already flushed, pressure-tested and validated. Rack heat crosses a metal wall in the pod's coolant distribution units and leaves through warm-water headers running on the campus's existing industrial pipe racks. Warm-water design means plain radiators reject it year-round.
The hall's existing pharma-grade air and humidity system is kept unchanged — only its source of cold water is new: sealed, air-cooled machines with a built-in spare.
NVIDIA's reference design for factory-built AI factory units on the Vera Rubin platform. Compute, cooling, power distribution and networking inside each pod are assembled and tested before shipment, to one validated specification, with 800 VDC at the pod input. What arrives at the dock is a finished unit, not a kit.
The integration that usually happens late in a build — rack plumbing, cabling, commissioning — moves upstream into a factory, in parallel with site preparation. That shortens the path from a ready hall to productive capacity and takes the largest execution risk off the critical path. Every campus in the program repeats the same unit.