ARTEMIS X

We choose the hard things.

Rice University · September 12, 1962

ARTEMIS X

750 MW
Planned program capacity, up to · 2030
July 2027
35 MW
Campus One live — 175 racks, 12,600 GPUs, in NVIDIA DSX POD units on infrastructure already standing
In place
~50 MW
Campus One expansion path within the same hall — no new construction
Q4 2027
50 MW
Campus Two online — a second identified campus on the same design
By 2030
Up to 750
The program — multiple campuses, one repeatable clean-sheet design

Planned capacity on the NVIDIA Vera Rubin NVL72 platform — 200 kW liquid-cooled racks. Figures are planned program capacity; projects are in development.

01 / The build

Go deeper

Contact

Come build with us

Artemis X develops dedicated AI infrastructure. If you need capacity or want to build alongside us, reach the team directly — tell us the scale and the timeline. Builders: we are hiring — same address.

Contact Artemis X↗